Sweden IKEA Distributed photovoltaic power station

Fully Comply with European Standards. 60 days construction period, engineering design, construction, and operation ability to achieve the European standard.
Advantages of industrial chain, power plant equipment matching rate over 90%, win high appraisal from IKEA.
The strategic cooperation relationship between ZTT and IKEA.

Construction date: 2015

Installation Capacity: 3.5MW

Why chose ZTT New Energy

Based on strong technical capabilities, ZTT New Energy has obtained UL and CE certificates for Lithium-ion battery cells, as well as the RoHS certificate, IATF16949 for supercapacitors. In addition to investing heavily in rechargeable lithium (lithium-ion), ZTT has dominated todays battery market in renewable energy applications that reached an annual design capacity to 3GWh for different kinds of battery cells and its quality objective is zero defects. Moreover, housed in an energy storage system (ESS), these utility-scale batteries enhance grid flexibility, reduce infrastructure investment, and optimize power flows.  

1.2

GWh

The installed capacity of electric power energy storage of ZTT reached

528,000

tons

Reduced CO2 emissions by an average per year

1.5

GW

The installed PV capacity reached

1.28

million tons

Reduced CO2 emissions by an average per year

Contact Us

Drop us a message! We’d love to hear from you.

Please contact us if you have any questions related to our products or if you need technical support.

You may call, e-mail or fill out the contact form and let us know your needs. Our sales representatives will contact you as soon as possible.

Call Us

Email Us